THE GRAPHICS CAMPAIGN & COST INTELLIGENCE PLATFORMFREE TO USE · FROM ONE WALL TO YOUR WHOLE PROGRAMME
Graphic Accord
Graphic Accord / knowledge

Coordinate permits and site permissions as explicit tasks

Make site permissions and any required consent questions visible tasks with actual owners and evidence.

Define the proposed work and location

Record the graphic, complete assembly, installation position, duration and intended activity. Identify who owns or controls the site and which organisation is responsible for the work. A campaign instruction does not establish permission to alter a building, place a sign or access a venue. The task is to identify the actual authority and relevant requirements for this situation, not infer a blanket consent from the presence of an existing sign.

Assign the permission questions

Ask the site owner and responsible delivery team which approvals, permits or consent routes apply. Record the exact question, responsible person and required evidence. Requirements can depend on location and proposed work, so do not invent a universal statutory checklist or promise that all signs need the same process. Use the actual relevant official authority or accepted site route to resolve consequential questions. Keep legal or specialist interpretation with responsible competent people where needed.

Separate requests and granted scope

Record requested, submitted, granted, conditional and expired states as actual events. A sent application is not permission to proceed. Preserve the accepted scope, dates, site or configuration and any conditions. Ask whether changes in artwork, dimensions, illumination, structure or position affect that scope. A site access booking can be accepted while another permission remains open, so keep the dependencies distinct before releasing installation.

Worked example — fictional

A fictional venue requests a temporary campaign sign at a proposed exterior position. The coordinator identifies the property contact and asks which actual permissions and review routes apply. One access window is confirmed, but the site’s approval of the proposed mounting remains conditional. The readiness record shows both states separately. When the graphic moves to another position, the responsible contact reviews the scope again. The programme does not call permission complete merely because the campaign owner approved the design or a calendar appointment was created.

Common pitfalls

Common ownership of the campaign does not grant authority over a third-party site. A verbal approval can leave conditions or location ambiguous if the actual process needs a recorded decision. An older accepted sign arrangement may not cover a changed proposal. Avoid inventing a permit number, issuing authority or legal exemption to clear a planning field. Keep unknown questions open and attributable until answered.

Make permission a real dependency

Use readiness checks to name each required decision, its owner, current state and evidence reference. Export the relevant accepted scope and conditions in the site pack. Ask responsible parties how changes and expiry will be handled. After work, retain the actual installed relationship so future maintenance, removal or reuse can identify the permission question rather than assume the first approval lasts for every subsequent campaign.

Decision checkpoint

Ask whether a recorded permission applies to the actual legal organisation, site and proposed arrangement being released. A useful attachment can still describe another tenant or an earlier position. Resolve that relationship explicitly instead of counting every document with approval in its title as current authority.

Take this to the next job

  • Record proposed work and site authority
  • Assign actual permission questions
  • Separate requests and granted scope
  • Preserve conditions and expiry
  • Recheck changed arrangements
Put it to work. Use the connected free tool to prepare your own record. Final production requirements come from your chosen provider.
Photography & image credits

Photographs illustrate display, production and venue contexts; pictured organisations are not endorsements or verified partners.

  1. "Birds Aren't Real" billboard in Memphis.jpg — Andrewj0131. CC BY-SA 4.0. Resized and converted to WebP; composition retained. Display may be fitted to the layout. The optimised photograph retains those reuse terms: download image.

Find a useful next step.